No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | CV. Kiram Abadi Konsultan | 80.464.838.4-801.000 | Rp. 79.970.000,00 | Rp. 79.970.000,00 | Rp. 79.970.000,00 | |
2 | CV.HM BROTHER ENGINEERING | 81.506.249.2-802.000 | Rp. 80.025.000,00 | Rp. 80.025.000,00 |